A quick unexpected trip to the Western part of the state allowed us a chance to swing by the Myrtle House and see how the plumbing and electrical are coming along. While the house still looks far from done, it is amazing how much progress has been made when you think about it. After these two systems are finalized, the only things left are insulation, drywall, window repairs, and masonry. Well, those things and making it livable with a kitchen, floors, and bathroom fixtures. ;)
Below is the switch that controls the exterior lights and living room fixtures.
HVAC, plumbing, and new joists/subfloor. I never thought construction would look so pretty.
Soon to be half bath off of the living room.
Stacked laundry room!
Master bath. Not too keen on the plumber's tub choice, so we are switching it out.
Kind of jealous of the guest bath. It has a very spacious layout.
Office/guest room bathroom progress.